Answer Posted / bhaskararao .n
Hydro power
plant has less
maitance cost
because water
availble at
free of
cost,less
labour cost
becaus few
numbers
required for
checking of
operation,no
fuel
transoproting
cost .
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how i chosse capacitor bank if my energy meter is 48 kvr? tell me capacitor bank chossen formula?
why occ characteristics curve in not tracing back when we are bringing back the rhoestat?
what parameters are should nessary for control technic dc drive(in rolling mills)?
what is negative d.c. voltage, why this voltage is used in base transciever station.
what is the differences between microprocessor and general purpose computer
How could a garment factory benefit from renewable energy
what is method for testing CT
Is it possible to protect 3phase overload and earth fault of the 3phase system using two CT's.
what is interpose? where it is used and why it is used?
which book to refer in electrical engineering for iocl exam & which book for general english.
what is the difference between single ratio, multiple core and multiple ratio, multiple core ? please explain.
CT Ratio of a energy meter connection is Red Phase : 100/5A, yello Phase : 50/5A & Blue phase : 100/5 A what is the overall Multiplication factor
why -48 volts dc used in telecommucation
How to protect a Dosing pumps/any sensitive equipment (single phase) from surge protection inside a food factory.
How to calculate earth fault current for 6.6 KV , 50 HZ , 756 Amps , 3000 RPM , 0.8 PF generator