Answer Posted / sudhir ram
5mm
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
how to workable concrete cube test M-25 design mix
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
Define What are the reasons for geotechnical site investigations in Uganda?
what isload waring calculation
why do we not deduct volume of steel to find actual volume of concrete in practical???
What is binding spacing of the rebars at lapping zones.
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
What is the effect of a building collapse?
PL.tell me about civil engineering questions with answer
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
How do you calculate the power of centrifugal pump?
How does siphoning work?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?