Answer Posted / parijaat
power load means the highest power that a plant can use,and
lighting load means the minimum power to maintain emergency
process running in a minimum load.Suppose a steel plant
requires 20 mw power to operate completely,then 17/18 mva
power is its power load,and 2-3mva load to operate emergency
processes in running condition,so it is its lighting load.
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
How to calculate that clean water supply in one Day from 150 KLD STP?
What is meant by vector group
what is doid
What is dc current source? Differentiate between ideal and non ideal current sources?
Enlists the applications of sampled data systems?
what is the maximim current drawn by 1 phase and three phase welding machine
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
How maesure earth neutral value & how much maximum value value required in between earth & neutral.
salam,hi, i need to know what the spesification of 300amp msb...
How to identify the start and end of 3phase 12 lead motor if U1, U2, etc numberings are lost or erased.
hi, could someone help me to find a control design for syncronising panel .
why we used ZNO in Lightning arrester.
If a shunt Dynamo has induced emf 100V and 0.4 ohm resistance and battery of accumulator of open circuit emf 110V and 0.5 Ohm resistance are in parallel what is common terminal potential difference?
HOW TO WRITE A QUENTION ANSWER? I MEAN SHORT OR LENGHTHY ? OR FROM THE BOOK AS BOOK..... SOME TIME WE GIVE A ANS FROM THE BOOK AS LIKE BOOK ND WE GET MINIMUM 60% MARKS OR MORE THEN....... THEN HOW TO FILL THE Q-PAPER?