my scenario is repetitive manufacturing (REM) make-to-stock
(MTS)production for sugar industry. What are the things, I
have to customize for this scenario, to the PP point of
view..
Answer Posted / shamshuddin
Repetitive manufacturing is selected in MRP4 TAB
one is check box repetitive , REM profile , production
version (Each pcc create one PV).
month end process
1) std cost ck11n
2) mark and release ck24 other wise run Ck40n
cost center level
assessment and distribution
actual activity price calculation
revaluation of activities
actual OH calculation
wip
variance
settlement
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Difference between Item categories or what is variable size item or non stock item.
What are gaps? Some examples?
What is "work center" in sap pp and what is the use of data in work centers?
How is the processing time calculated in a wc when both labor, machine categories exist?
How do I default it 41?
What is mrp controller means?
What is MTS and MTO and the difference between them?
what are the settings needed for variant configuration?
Define gaps.
Have you used Pull list or back flushing in REM?
what is alternative item group
Difference between Manual reorder point and Automatic reorder point.
What is the internal recruitment?
Explain what is the meaning of exploding a bom?
what does SAP business workflow do?