Steel Calculation for Footing, Beam & Columns?
Answer Posted / shohel
yes
| Is This Answer Correct ? | 19 Yes | 3 No |
Post New Answer View All Answers
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
All aptitude question of Bechtel
In earth work 1300 cum soil how to calculate how many liters require in water
which method is used in semi-rigid connection design??
Which is the latest version of solidsworks?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
How much cement and water required for cement selery????
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
how many time use of plywood shuttering and IS code
What is critical path method (c.p.m)?
Define What is Civil Engineering?
Why are steel plates inserted inside bearings in elastomeric bearing?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
How to calculate laplength for 3 floors