How to code Page up and Page down in RPG for Single page subfile without using ROLLUP/ROLLDOWN in DSPF ?
Answer Posted / danny
Use PAGEUP/PAGEDOWN instead of ROLLDOWN/ROLLUP.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
How to call one program from another program in RPG? please help me with the code
What is file identifier where we can use?
what is kids-rpg?
what is program status data structure?
If my rpg program has a date field, what extra care I have to take while compiling that rpg program? If the file is keyed and I have declared the file as well as key list properly in my program. Still am getting an error message like "chain/reade operation is not allowed" what may be the case?
how can you display specific subfile page on the screen in unequal subfile?
How to handle duplicate error handling in RPG?
How Chain operation copies the record's data to the input buffer for the program?
what is the difference between do while and do until?
during execution, an rpg/400 program automatically follows a sequence of operations for each record that is processed. The built-in program cycle includes the following logical steps.
How to declare the pull button in AS/400..
what is a rpg?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
How to write record if no field or the field are different in physical file in rpgle ?
Explain mdt?