cement consumption per square feet in multi storeyed
building
Answer Posted / rajeshwar sharma
.30 bags per sft
| Is This Answer Correct ? | 3 Yes | 5 No |
Post New Answer View All Answers
what is the name of shuttering oil used in oman
What black man invented the clothes dryer?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
Give me an example of a time when something you tried to accomplish and failed.
what is the formula to find the diagonal shape stirrups?
what could be the production cost of 1 cum of concrete by CP30 plant
What is soil enforcement?
Define What is the tallest man made structure in the world?
What is difference between code and standard and specification?
What is meant by engineering drawing?
what is the permanent solution applied for restoration of leaning tower of pisa?
explain five benefits of using standard terminology in the measurement process?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?