I know chain keyword retreive records randomly but how chain
keyword exactly works internally????
Answer Posted / aditya
hello ,
see chain opcode locks the first record of pf and then
starts reading.it is useful when there are multiple
receivers present in your program and you want any specific
receiver.
it is always used with HIGH indicator.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
How to write record if no field or the field are different in physical file in rpgle ?
How many program bind in one module....
how do I play {insert rpg system here}?
what was the robotech rpg?
how does the rpg element work?
what are the key words you must use when using a subfile?
Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.
what is an online rpg?
How to handle duplicate error handling in RPG?
what is the necessary keyword needed to scroll subfile records?
what is the difference between do while and do until?
What is the purpose of record level identifier?
What are the types of identifiers?
Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.