whatis means of PPA & FSA OR SFA in power plant operation
Answer Posted / mob
PPA - power purchase agreement
FSA - Fuel supply agreement
| Is This Answer Correct ? | 20 Yes | 1 No |
Post New Answer View All Answers
operation
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
what is natural frequency of turbine shaft .
How to calculate power press toneage
what does mean by kva rating
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
why airtel use + 24 volts and other operators use -48 volt
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
can dp type level transmitter work in under vaccum condition
Why superheated are started before I'd and rd fan?
explain how the third harmonic content of the magnetising current affects transformer design
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?