WHAT IS THE LAP LENGTH FOR COLUMN WITH DESIGN MIX M-35 RCC

Answer Posted / gopi

50 times the bar diameter. tis is common

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

in the earthquqke the profile of water on dam is parabolic or not

1465


how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

3326


Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice

2195


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2378


could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!

1675






Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct

1026


For the construction project what capital cost has to be taken in consideration?

682


how to find hardness of water?why it should be determined?

1592


What is meant by dimensioning?

662


what isload waring calculation

1910


Define What happens to Load at yielding ?

1341


what is w/c ratio in dry lean concrete for m10 mix design

7997


If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

1722


Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?

1984


I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

1569