What is labour ratio for construction of residential
buildings
Answer Posted / er gulzar ahmad
It is usually 40% of the total cost while using the normal
finishing items
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the cemnent ratio
How many square meter can a worker/labor demolish a structure per day?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
What is factor not to be taken in consideration in mix design?
Which is the direction for positive angle?
how to take concrete quantity for precast segment for viaduct project?
What is the absolute pressure scale?
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
Explain the mechanism of cavitations in pipes and drains?
how much cost of single coat 20mm thick plastering per sqre meter
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
Which is the best book for building construction?
what is polity
what is E
Who designed the city of washington dc?