what is the diffirence between deviation and change control?
at what situations we can raise the deviation and change
control
Answer Posted / ketan patel
When we change any process or any equipment the documentry evidence need to check it for proper work by raising changecimontrol.and if we deviat system by no changes only for temporary changes we have to fill deviation. It both are completely fill by all concern department.and close in 30 days.and if note done than close by raising in 60 days.
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
please explain the job responsibilities of quality assurance..
Tell us about your oncology experience.
How to do IR test of hydroscopic materials
What is the role of buffers (ex: KH2PO4) in HPLC analysis,
what is ur strengths and weekness in ur professional life as medical rep?
Iam a B.PHARMA GRADUATE from DELHI UNIVERSITY and I am looking forward for DRUG INSPECTOR EXAM..kindly mail me any ques papaers reg the same...
what is your experience in medical continuing education.
why nitrogen charecter as a inert gas plz identified
what is the leak test procedure of filled bottles (liquid)
what is meant by artwork review and handling procedure with an example?
while formulation of Gliclazide floating tablets why we are using direct cmpression technique why not wet granulation and what happend with that
from hplc chromatogram how can we say that calibration is needed now?
What do you mean by GTT? What are the effect of GTT on film coating.
What aspect of your communications skills have you improved the most in and how did you accomplish this improvement?
Do you think it is possible to rehabilitate?