a)If column dimensions are 250*400mm , what will be
cutting length for 8mm stirrups and how to calculate it? b)
If beam dimensions are 200*400mm , beam coveris 25mm , slab
cover is 20mm , what will be the cutting length for
stirrups? c)Column dimensions are 250*400mm , reinf. is
12nos. bar of 16mm dia , stirrups provided are two legged,
what will be the length of each ring?
Regards
Answer Posted / manish
a) Column size= 250*400,
so, L=250, B=400, cover = 40mm, bar dia 8mm
Cutting length of stirrups
= 2(L+B)-(8*cover)+(2*10d)-(1.5d*nos of bends)
(2*10d) is for 2hooks,
1.5d is deduction for elongation at each bend
Calculation =2*(250+400)-(8*40)+(2*10*8)-(1.5*8*5)
Cut length= 1080 mm.
| Is This Answer Correct ? | 48 Yes | 19 No |
Post New Answer View All Answers
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
How to testing voids of filled aggregate in bitumen mix design
I need old MMUP exam question and answer for Civil engineering
How to do base isolation using ETABS software?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
Define What is the distance between railway tracks?
can you give me the details of rate analysis of steel and concrete?
how to do sudoko puzaals?
PL.tell me about civil engineering questions with answer
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
Formula for calculation volume of essentric footing
Reinforcement details at hinged joint
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
what is the difference between replacement of cement by groundnut shell ash