Answer Posted / chandrashekhar
Business blue print is nothing but a goal of the company through this goal to determine the business.
BPP mainly 2 stages
1)AS-IS: In this report given by client
2)TO-Be: according to as-is we are preparing in sap ex; material master(How many materials & those material no), bom(simple or alternative bom),workcenter
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
Difference between Manual reorder point and Automatic reorder point.
Difference between different strategy groups.
What are the types of master views for production and planning?
What is SOP and types of SOP?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
Why is work scheduling required for semi finished and finished products?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
How is the processing time calculated in a wc when both labor, machine categories exist?
What is MRO area & MRP group & some difference
Explain what is routing in sap pp?
In cost controlling information system mention the fields that are listed in the list screen of the report?
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?