what is permissible IRC limits of silt content in river sand
in India
Answer Posted / yogesh
IT is about limit % not more than 6% to 7%
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
For a washout valve why are two gate valves required in normal practice?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
rate analysis for cement pointing 1:4 , for 100 sq m
The 4 main factors to start a construction project are––
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
what is polity
For what building Built-on balconies are preferable? What are the advantages?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
What is componsation
Explain what is the difference between built area and super built up area?
Is it possible to make a feature using an overdefined sketch?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
What is aggregate?