Answer Posted / sundar g
distribute the load to main rod
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Which are the top apps for you civil engineer?
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
Critical Path Method is...
What is the difference between routing maintenance and major maintenance in school facilities?
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
Is it possible to make a feature using an overdefined sketch?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
what radial pressure, the NP2 class rcc pipe can sustain?
How to calculate carrying capacity of the existing water supply trunkmain
Why the finite element method is lower bound solution?
400 ku d/c clearess ketan hota hai?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Explain soil analysis?
where i can get material costs on weekly basis