HOW TO DELETE THE RECORD FROM MASTER FILE WHICH IS LINK BY
ANOTHER TRASATION FILE WITH REFERTIAL INTYGRITY?
Answer Posted / maheshg
Delete the record from dependent file where it has
REFERTIAL INTYGRITY then delete the record from master
file.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?
How can we know running job is batch or interactive?
can any one help in hawkeye and turnover or any change management system plzzzzz or send the documents to my mail id :gvsp.as4@gmail.com
how do I declare a table or array in rpg iv?
what is a rpg?
which program rpg or cl is efficent to update a transaction onto a database file and why ?
How do u design a physical file, when you have 2 Unique fields like for eg in A student file student ID and student examination no both are unique
if there is a module object , how to find the program object for this module object.Assume the module object name and program object name is not same.
Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.
what was the robotech rpg?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
give an eg of ACQ-(ACQUIRE),BIT OFF,BIT ON,DEALLOC,DUMP,FEOD,FORCE,MHHZO,MHLZO,MHLLZO,MLHZO,REL,RESET,TESTZ,TESTB,TESTN----GIVE SMALL EXAMPLE TO THE OPCODES...TO UNDERSTAND FUNCTIONING...........
what is the use of sflnxtchg?
how do I declare a minor?
When it is desirable to describe files Internally?