Answer Posted / annasuryawanshi
i don't know the answer therefore i am asking this question
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
may i know the detailed description of cutting length
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
how much shouid be the rate for ready mix concrete per cubic meter
How much time Required for PPR pipe network testing
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
what is the use in canals of longitudinal drains and cross drains in lining areas?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
what is escalation?how it is done?
though u r a civil engineer, y r u interested in tcs???
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
Different sizes of Hollow blocks and its weight. Thanks.
How many % we consider for lap for reinforcement for estimates