If there is no sufficent time for testing & u have to
complete the testing then what will u do?

Answer Posted / rugvendra

There should be enough and sufficient time tio carry any
kind of testing ,if there is no such time constraint we can
check functionality and Usability testing as we do in War
room having only the basic feature of the fuctionlity

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Hi, this is not a tech question, i have 4 yrs of experience in Mainframe systems, presently as a mainframe tester in pune, i just want to step towards south locatios(preferable hyd), suggest me the best way to get calls from hyd.

1866


Explain the difference between severity and priority.

870


How do test documents in a project span across the software development lifecycle?

1382


What is bottom-up approach?

843


What is test closure?

1111


Need to know about Quality Center in brief

1703


Explain test metric and the information it provides.

872


When will the testing starts?

860


Difference between Re-testing and Regression testing?

897


What are quality assurance and quality control?

858


what is mean by impact analysis ,how we used to select regression TC using this?

1826


What's the relationship between environment reality and test phases?

1165


Why Equivalence Partitioning is called equivalence or what is the significance of equivalence term in ECP?

1841


how to write manual testcases for download the files from the template. for example:from product cost enddate

1920


What is checkpoint? How can you handle the checkpoints?

2185