Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In close vessel/ drum why we use d.p. transmitter of -ve
range i.e. (-)500 to 0 mmwc.

Answer Posted / venbha123

If the LP leg of the transmitter is kept dry, steam may get condensed in the LP leg because of which the level indication may be wrong. Hence We are using wet leg for LP side of the transmitter, which is initially filled with pure water. When the drum is at zero level, the pressure difference is only the head pressure acting on the LP side - that is 100% level head at LP side. Normally in DP transmitter the HP side pressure will be more than the LP side. In this case since the pressure in the LP side is more than the pressure in HP side the range is mentioned as negative. At 100% level both the head pressures at HP & LP are the same, the DP becomes zero. Therefore the range is mentioned as: from negative value to zero.

Is This Answer Correct ?    12 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the purpose of LO Overhead tank in turbines.

1996


How many ohms are required for proper earthing?

1085


how works encoder in plc

2068


How do bending tubing provide better measurement than using tubing fittings such as elbows?

1925


sir,would you please send me the Hindustan petroleum corporation limited papers(HPCL).my e-mail ID is ujjwal_sharma1983@yahoo.com

2320


typical loop drawing of a simple feedback control comprising of one transmitter and one control

1986


Coal mill Instruments Equipments for cement plant And process diagram ?

2916


can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know

2121


Isometric drawings are generated during _________________ phase of a project

2071


why we are using drum level control valve air to close?

2090


With N nodes and B branches what will have a network ???

2020


I WANT SECURITY PAPER MILL, HOSHANGABAD TEST PAPER.KINDLY SEND TO MY MAIL ID

2787


May I have a brief note above the voltage barriers? Whats is the purpose? Please mail me if you've operational details, mail id: rajkumar.diice@gmail.com

2125


hello sir/madam, I,Subramanian need 5yrs placement papers of officer trainee of Instrumentation technology.pls send to this mail id mani_nxtgen@yahoo.co.in please do the needful. with regards, subramanian.v

2208


How to calibrate H2s Dectector

1616