.What are the equipments should run when there is a black
out in power plant.
Answer Posted / azam
The lubrication pumps for turbine, start motor and the control supply for i/o and MV feeders should always be available for specially gas turbines.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
How to calculate power press toneage
explain how the third harmonic content of the magnetising current affects transformer design
what does mean by kva rating
what is the trip circuit supervision in an electrical meaning?
what is the difference between compensated & normal drum level in boiler drum?
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
Why superheated are started before I'd and rd fan?
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
operation
What is difference between secondary Air & Tertiary Air and Their use.?
what is the basic use of power plant in equipment