what is the diffirence between deviation and change control?
at what situations we can raise the deviation and change
control
Answer Posted / mahendra singh devda
Deviation means If we not follow established procedure or if
any change in written established process.
Change Control Proposal is a systematic procedure for any
change in established procedure, equipment,facility or documents
as per requirements & raise by concerned department with
proposal and justification and all relevant supporting
documents and approved by QA after evaluation.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
What are your intentions towards the uplift of the hospital.
Caffeine standard is recommended by the monograph for HPLC wavelength accuracy calibration. It is covered range of 205 to 273 only.If the method have wavelength beyond the range, then how it supports for instrument performance?
Can any one tell me that which brand hplc column is used for levetiracetam imp- b test.
How can I assign a retest date for solvents e.g. toluene, methanol, etc?
how many clauses are there in iso? give me the clauses details?
What is the role of buffers (ex: KH2PO4) in HPLC analysis,
How to preform dissolution profiling
why you are become a medical representative
please e-mail me the model of Tamil Nadu drug inspector question papers
If calibration of 12 bowl dissolution apparatus does not meets single stage procedure, how can u proceed calibration?
How are you qualified for the position of Assistant Clinical Director?
Give an example of how you've handled a problem patient.
What are the regulatory commitments in markets like USA, Canada, Europe, Brazil, South Africa and Japan
What is forced degradation study?
what is meant by artwork review and handling procedure with an example?