why any normal motor have to provide star & delta winding
distribution during starting?
Answer Posted / dinesh
As we know that the starting current of motor is high due
to absence of back EMF and low resistance of rotor. In
order to cotrol the starting current we use star coneection
for few time and than your mtotr runs in delta.
As we know that stating torque of induction motor is
directly proportional to square of supply voltage so your
voltage value becomes supply voltage/1.73 and stating
current is limited in star connection and then back EMF
comes into picture
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
hello! sir i did three year of diploma in electrical (2007- 2010) and now i m a student of electrical engineering. sir can i apply for germany visa for study and part tome work over there?
what is x'mer ,isolation x'mer & yltra-isolation x'mer?????
Define active filter?
How to select a cable size for particular load?
Is the installation of the filter cloths necessary before spreading the gravels at the transformer yards?
If we have use two power cable for incomer, that time how many use cbct for earth leakage protection? 1 or 2 if 1 way? If 2 way?
what is meant by moulded case circuit breaker ?
Is vtg is controlled by the resistor? if else how much?
0.5,1,1.5,2.5,4.0.6.0,10,16 square mm electrical wires how much take maximum current in 50htz
Why a tesa lamp is glow between two phase?
plz send me the placement interview question and answers of whizchip(technical and apttitude)..i have an interview in next.
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
Can Anyone Answer anyone of these ? Q1) why direct SOLUTION of Load Flow Studies in Not Possile ? Q2)Why majority of Buses in power system are load buses Q3)Why one of the buses in Power system is taken as reference bus (slack or swing) Bus ? Q4)Bus Admittance Matrix is a sparce (means it contains some zero elements ) matrix , give reason
how the synchronizing is obtained at bus couplers in grid substation? (because there we cannot change the frequency in one of transmission lines like in generator synchronization)
how to compute kAIC? with formulas...