I am having develoment with 3 clients (100,200,300) and in PRD one client(500)after an year i purchased a new machine for quality so i want to import 2 clients (100,200) and in qas but i want the 100 client only sap_user and sap_cust profiles and 200 client sap_all only can i do that in quality any answers plz suggest me
Answer Posted / m k chaitanya
1.Using Remote client copy(tcode-scc9)we can copy the data
between two clients from two different systems(but the
systems are to be in landscape and reachable through RFC)
2.If the systems are not reachable through RFC we can use
CLIENT-EXPORT&IMPORT METHOD(T CODE SCC8 AND SCC7)
Process:
Always client copy should performed in target client.So
login with TARGET CLIENT(100-QAS)
1.Define RFC Connection between SOURCE CLIENT(DEV-100) and
TARGET CLIENT(QAS-100)
2.Exexute SCC9
3.Select required profile(in above question required
profiles are SAP_CUST and SAP_USER).
4.Select destination RFC
5.Schedule a background job or run in dialog mode.
Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
what is the procedure for java stack upgradation?
What is the need of having Development system?
How will u send mail after completion of backup?
What is sap single stack system?
What is the difference between central instance & application server?
What are the different types of rfc?
How u will give new authorizations?
can anyone tellme java instance startup sequence?
Is there a way to perform sapgui 640 roll out using a centralized server?
How do you create an instance?
IN FUNCTIONAL MODULE SD WE UNFORTUNETLY DELETE OUR ONE ITEM CATEGORY "TAN" FOR THAT WE WANT RECOVER IT WHAT ARE THE PROCEDURES. IS THERE ANY PROCEDURES LIKE RECYCLEBIN. TELL US DETAIL PROCEDURES STEP BY STEP PLEASE
If job is slow?
How to make security authorization reports?
If client copy is stopped in middle, what happens if you want to start it again?
What are the Parameters need to be set when connecting EP to r/3 system what are they?