Answer Posted / satyaprasad
testcase authoring productivity
testcase execution productivity
efforts variation planned effort - actual effort
efforts estimation= ________________________________ * 100
p.E
bugs found in testing side
defect removal efficiency= _____________________________
bugs found in (testing side +clientside)
hi this is satya ,any doubts contact:991212418320
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What do we need to build a quality QC team ? a QC manager with all junior QCs or a QC manager with all senior QCs?
In a systen design to work out the tax to be paid: An employee has Rs 4000 of salary tax free. the next Rs 1500 is taxed at 10% , the next Rs 28000 is taxed at 22% , any further amount is taxed at 40% , the nearest whole Rs, which of these is a valid boundary value analysis test case ???? a)Rs 1500 b)Rs 32001 c)Rs 33501 d) Rs 28000.
Hi,Please can any one tell me about SAP Testing concepts.
whats the reason to display the password(not in encrypted form) in the script in load runner but not in QTP?
Explain the defect life cycle.
Tell me some Adhoc testing scenarios of ebay (online auction product)?
any one giv test cases for wordpad using equivalence class partioning
What are the main key components in client and server applications?
In which all places, testing is done?One is from the server by calling server name.Can u suggest others?
What icon is used in WinRunner to get an explanation of the syntax of TSL?
what is dib format?
what is API 2.0?
What are the different ways of doing black box testing?
What is remedy testing,expalim that and how can use that
Hi, I was asked following question during a interview. Please answer it: Password field is there,we can accepts every character except underscore and semicolon. It can accept min 6 characters and maximum 12 characters. Prepare boundary value and equivalence class test cases.