How we can calculate the quantity of sand, & cement, & also
aggregate for a slab.
Length 25'/3.28 = 7.62 Mtr
width 20'/3.28 = 6.09 Mtr
depth 6" /3.28 = 0.152 Mtr
Answer Posted / pravinkumar .a.thakor
slab in m-200 cc
7.05 cmt
sand- 2.679cmt
cement- 77 bags
aggregate- 5.358cmt....
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is difference between engineering stress and true stress?
Water filter calculation formula
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
for pretensioning which will yield first and same for post tensioning?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
why is the column design?
five benefits of using standard terminology in the measurement process
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
What is construction mitigation management?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
Which are the Steel tests ?
what is the productivity in aluminium shuttering per day
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?