Factor of safety for steel should be based on its yield stress or its ultimate stress and factor of safety for concrete should be based on its ultimate stress or its yield stress?
Answer Posted / mayank jain
Factor of safety
for steel :-based on its yield stress
concrete :- based on its ultimate stress
| Is This Answer Correct ? | 35 Yes | 7 No |
Post New Answer View All Answers
How to testing voids of filled aggregate in bitumen mix design
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
in 100 cft = 1350 bricks in 100 cft = ? bloks
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
How many cum of 9.5mm stone in 1 ton ?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
How much cement is require in one sqft area in a G+3 residential construction.
Explain what is Critical Path Method (C.P.M)?
What is meant by scaffolding coefficient?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand