Factor of safety for steel should be based on its yield stress or its ultimate stress and factor of safety for concrete should be based on its ultimate stress or its yield stress?
Answer Posted / mayank jain
Factor of safety
for steel :-based on its yield stress
concrete :- based on its ultimate stress
Is This Answer Correct ? | 35 Yes | 7 No |
Post New Answer View All Answers
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
Define What is rigging?
What is the difference between one-way slab and two-way slab?
What do you meant by gui?
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
yasser arfatcompleted his degree in civil from which university
in design case of structural member best suitrable percentage of steel limit is what
In the roof of a pumping station explain briefly the components of a waterproofing system?
What is the outturn of Ceiling plastering
How to calculate laplength for 3 floors
How many feet are in 4 square yards?
What is the diff between cad & cadd?
How many cement sand ballast in cc 1:4:8 40mm
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)