Answer Posted / neelam saroj
A very simple definition of stress is
Stress = Load / Area = P/A (Unit N/mm2)
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
in one SQM plaster how much Cement and sand consumed in ratio 1:4
How we calculate the service time of buildings
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
What is bylayer?
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
Why reinforcement done in shorter span in two way slabs
difference between trapezoidal and pedestal footing and how the load acts on that
What is quantity of cement and sand required for 2000sqft of tiling?
How to determine spacing of bars in slabs or beams
what is the most suitable foundation when construct a bird watching tower in a marshy land
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
What is the l/d ratio of cantilever beam?