why main steel is to be reinforced in shorter direction in case of slab?

Answer Posted / smoib428

not rectangular beam, slab

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?

707


how much quantity of cement,sand and water required for 1 sq feet flooring work .

2004


What is the difference between one-way slab and two-way slab?

670


HOw much % of premium on DSR-2013 currently

1548


what is right & short method of measurement of slab&beam

1653






how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

5805


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

1910


What tor stands for in tor steel?

636


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1685


What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????

2371


what is the specific gravity of rubble in plum concert

986


60-70 grade of Bitumen is VG-30 ?

1690


Spider cracks occur in beam bottom due to––

1661


I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.

1685


reinforcement slab, beam and column formulas?

2206