what is the difference between two way slab and flat slab?
what is the benifits of flat slab?
Answer Posted / neelam saroj
if Ly/Lx < 2 then the slab is Two Way.
and if Ly/Lx > 2 then the slab is One way.
Ly is Longer Span of slab
Lx is shorter span of Slab.
Flat slab is different then the above.
In which beams are not designed and the in casting of slab
is prestressed or Column cap are used.
Advantage =it will give a clear height (without beam) and
good architectural apperance.
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
What is the different type of slump test indications?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
What is the tensile strength of wood?
How much cement is require in one sqft area in a G+3 residential construction.
whou haat goals do you have in your career
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
about higyway engineering
how to convert cement, sand aggregate quantity from M3 to kg with full description?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
how to shuttering is used in slab
What is the meaning of a blue land surveyors flag?
Wats the formula of eccentric footing and how was calculated from concrete qty
procedure for preliminary selection of size of column of 5 storey building