how can we select the rating of Load break switch that is connected to
the primary protection of 200 kva 11kv/415v distribution transformer??
step by step calculated answr pls...thnk.u
Answer Posted / guna
Depends up on the load current we have to select the LBS
instead of VCB or SF6 (LBS is less cost for the same rating
when compared to the above cb's)
P=1.732*V*I
I = P/1.732*V
I = 200KVA/1.732*11KV
I = 10.49 A
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
Electromagnetic torque developed by the motor is compared to shaft torque. A less B same C depends on motor design D more
checking procedure of capacitor based motors.used in fans etc?
hi,every one, i have to write the search paper on "performance policy optimization" of NGN (next generation networks). i need the material on this topic. can any body help me. please tell me any useful site where the good material is available and name of any reference book. it should be a great help for me.
bus bar design conditions and sizing pls tell me quickly
Why hydropower is called renewable source of energy?
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?
Define reserve-generating capacity?
what is the meaning of 0.5ohm Resistance
In a tap changing transformer where is the tap connected, is it connected in the primary side or secondary side?
What is MSL designation of a motor and same may be provided in details.
What is capacitance?
hello if any one have papers vof hpcl or sail, plz send me
How line capacitance & line inductance varies with increase in height tower.
What is given by the definition in BIL IMP/PF = 950/395 kV. This was found in a name plate of a power transformer.
describe the A.C. Generator Testing procedure