Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how can we select the rating of Load break switch that is connected to
the primary protection of 200 kva 11kv/415v distribution transformer??
step by step calculated answr pls...thnk.u

Answer Posted / guna

Depends up on the load current we have to select the LBS
instead of VCB or SF6 (LBS is less cost for the same rating
when compared to the above cb's)

P=1.732*V*I
I = P/1.732*V
I = 200KVA/1.732*11KV
I = 10.49 A

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Electromagnetic torque developed by the motor is compared to shaft torque. A less B same C depends on motor design D more

2037


checking procedure of capacitor based motors.used in fans etc?

2122


hi,every one, i have to write the search paper on "performance policy optimization" of NGN (next generation networks). i need the material on this topic. can any body help me. please tell me any useful site where the good material is available and name of any reference book. it should be a great help for me.

1923


bus bar design conditions and sizing pls tell me quickly

1898


Why hydropower is called renewable source of energy?

1049


As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?

1769


Define reserve-generating capacity?

1180


what is the meaning of 0.5ohm Resistance

1861


In a tap changing transformer where is the tap connected, is it connected in the primary side or secondary side?

1140


What is MSL designation of a motor and same may be provided in details.

1715


What is capacitance?

1231


hello if any one have papers vof hpcl or sail, plz send me

1921


How line capacitance & line inductance varies with increase in height tower.

2334


What is given by the definition in BIL IMP/PF = 950/395 kV. This was found in a name plate of a power transformer.

2357


describe the A.C. Generator Testing procedure

2172