Answer Posted / ujjawal u daharwal (sgsits, in
very simple
Note: d1^2/s1 = d2^2/s2
where, d1= dia of available Bar
s1= spacing b/w available
d2= dia of new bar
s2= spacing of new bar
in this case; d1= 8mm, s1=150mm, d2= 10mm &s2= ?
8^2/150 = 10^2/s1
s1=234.375 mm c/c = 230 mm c/c ANS
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
How to check slab shuttering level.? Or check list for slab ?
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
can i get hindi version of is codes based on civil engineering?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
Define What does civil status mean?
what is the weight of 12mm aggregates?
how to calculate the concrete mix m30 by volume
what is the relation between pitch of steel and depth of slab?
1:4:8 pcc calculation 591 cu.ft
What are advancements in civil engineering?
How much cement will require for 1Rmt Skirting laying
What are the advantages of cad software’s?
What is modular elasticity?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance