please tell me how to convert cubic feet to cubic meter
Answer Posted / siba sankar sahu
1 cubic feet means 1 feet x 1feet x 1feet
and 1 meter = 3.28 feet
so 1 cubic Meter = 3.28 x 3.28 x3.28 = 35.28 cubic feet
so 1 cubic meter = 35.28 cubic feet.
Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
what is differences between ferrock and concrete ?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
What is min thickness,min grade of conc & age of PQC ?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
What is the usage of zoom command?
How to calculate the crank rod in slab
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
what is the effect of duration of earth quake on framed structures ?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
how to caliculate required amount of cement and sand required for 1cu.m.