what is the ciruit diagram of transformer vector grup test?
Answer Posted / vels
no circuit dioagram is needed
we apply voltage on HV side
measure voltage with respect to the condition of vector group and confirm the vector group
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
EXPLAIN THE TERMS "INTEREST AND DEPRECIATION" AS APPLIED TO ECONOMICS OF POWER GENERATION.
what you have to see after one week or month from the day of installation of transformer ?
Why space heater is required for each verical bus bar chamber? if one space heater is adequate or not for anti condensation?
i want to learn control schedule for 11kv panel? can any one send the detailed control schedule?
Dear All, I am new in construction company , my boss ask a question at time of interview , If we have 60MW generation and Single Power Transformer step-up we have. if CMR 50/60MVA , ONAN, ONAF respectively , is it sufficient or not ? for that much power to transfer,
draw a circuit diagram connecting transformer OLTC- RTCC- VCB-Marshalling Box otherwise Explain in words
bsnl tta exam question
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
trasnfarmaer core make
how to fit 3 HP crompton gear motor with conveyor with the use of staring delta starter or ordinary starter?
what is the reqirred voltage in HT motor to get full RPM on no load test?
what is the differebt between ac and dc fuse?
When we use air circuit breaker, it has O/L protection ,time delay SC protection, Instataneous SC protection & ground fault protection. They all have some setting range. But what is the suitable/allowable setting for the above protection which will be safe for the equipment? For example-O/L protection setting have a range of (0.4,0.45,0.5,0.55,0.6,0.65,0.7,0.8,0.9,1.0)xIn Time delay SC protection have a range of (1.25,1.5,2,3,4,6,8,10,12)xIn Time delay setting is 0.02,0.1,0.2,0.3,0.4 Instataneous setting is fixed to 20xIn Gound fault setting is given 100A,300A,600A,900A,1200A This setting are for 2500A ACB. So what will be the basic allowable setting for the above protection? is there any formulae to calculate this<
substation+ plc system
What is polar plot?