Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / kuldeep yadav
V2= D/6(a1+a2+4Am)where Am=(a1+a2)/2
And D=D-d(total Depth-rectangular Depth)
a1=area Of Footing Bottom
a2=area Of Footting Top
V1=(LxBxd)
V=V1+V2
| Is This Answer Correct ? | 25 Yes | 14 No |
Post New Answer View All Answers
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
what is Bearing Capacity,How to determine it?
How to calculate laplength for 3 floors
how to find ssm in foundation?
What are the advantages of cad software?
What is the tensile strength of wood?
How to calculate the load of partion in flat slab if we use brick?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
How many cement sand ballast in cc 1:4:8 40mm
how to find out hard strata in bored pile when the DMC method adopted.
Describe a time when you anticipated potential problems and developed Preventive measures
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.