Answer Posted / vydehi
drawing is language of civil engineer. civil engineer is heart of civil engineering.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How to do rate analysis for concrete work including shuttering work?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
What are the different methods for drawing an arc?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
What is the significance of cost estimate knowledge for an architect?
Explain the latest method to detect a crack in a building?
What is the average density of soil?
Describe a time when you anticipated potential problems and developed Preventive measures
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
Which are the Steel tests ?
how we check the thickness and line of ceiling plaster.
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
What is portland cement