Answer Posted / somu0507
The one pole of the CT is earthed to avoid voltages being present due to capacitive coupling between the CT secondary and the line being monitored (CT Primary). At low voltages CT Secondary is not earthed but this is always the case with 11Kv and above.
| Is This Answer Correct ? | 27 Yes | 5 No |
Post New Answer View All Answers
define reflection method?
What is the difference between Generator Differential Relay and Transformer Differential Relay?
which types of relay used in acb and vcb?
can we use trip light with bus coupler?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
which protection used in power plant?
If anyone would like to know or practice for FEWA papers contact me on mohamedrashad2@hotmail.com Just completed the supervisor exam in April 2021
why we need to us lenz's law for synchornous motor
if 2 coil of 1000W connect in series and 200 v is applied across it . then what is the total power of coil when coil have only resistive load .
Following test should be conducted to find out relative polarity of transformenr terminals A no load test B back to back test C phasing out test D none of above
Is there any reason that we get shock on touching phase wire because the earth is at neutral potential? Is there any reason that the earth is at neutral potential because the neutral is earthed in apower station
why the arc welding machines require parallel earthing systems? ie why each machines are connected to earth pit by separate wires during earthing? wats it adavantages?
Which type of air compressor is used now a days in the market. Keeping in mind of energy efficiency and maintenance points. Relevant documents may also be sent on mentioned email ids.
what is the method of earthing of a transformer using electrodes?
Dear all: Recently we got a question about Interface between PMS and SAP-PM.once we got a update message from PMS.we should set the deletional flag for functional location in SAP system.Is there any FM or BAPI to use?There are only functional location create and change provided by SAP. Best regards!