How do you find the difference between 53&43 grade cement
in site?
Answer Posted / pradeep
surface area is increased for 53, because of more fineness and pulverisation
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
Advantage of Aluminum form work in terms of activities can be skip and cost too
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
What is made from large rocks, which protects the base of cliffs?
Slump Values for works?
How to calculate the load of partion in flat slab if we use brick?
What is construction mitigation management?
how to caliculate required amount of cement and sand required for 1cu.m.
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
how to check and keep control on the wastage of material at site
what are the Task work of different labour.?
How to do rate analysis for concrete work including shuttering work?
Explain what is the difference between built area and super built up area?
What is the general specifications of a bituminous pavement road?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?