Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is Ten Delta Test ?

Answer Posted / raj

before doing tan delta test, just we know that its for
determine the condition of insulation to the equipments.and
it has more benefits when compared to meggering(IR).megger
means to find insulation only behinds surface condition.but
for tan delta/dissipation factor/loss factor/power factor
is to determine internal void conditions, and their
capacitances.
permissible limits of tan delta for all bushings - 0.7%
then important one while testing of tan delta, we should
take the current test temperature, then correct that one to
20*c. . .
for that correction we should take the values from the
correction table that we do by using specific testing kit.
for megger make,doble,eltel we have different tables. just
refer and correct it.
impt: it will be compare with factory reports only after
correction of values to 20*c

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are :- AC Distribution Board (Single & Double Front) DC Distribution Boards Distribution Board LT Breaker Panel.

2139


What is the effect on power factor, shown by a trivector meter; incase of reverse phase sequence. If the power factor of a system is lag what meter will show in case of reverse phase sequence connected to the meter. and What in case of lead.

2371


in indoor type circuit breakers why only the corner breaker trips specially during cold season. What is the reason.

1922


what is the necessity of under ground cables ??

2138


is this the formula of building wiring to get the main breaker.Watts/volts*.8%+higher motor*(25%)=ampere. yes or no or send the correct formula for building wiring.

1756


How to calculate cable size in HT AND LT

2064


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1837


show the single line diagram of star delta starter with single phase preventer

4693


The 3 phase Delta connection RB=440V, BY=350V,.......* is Line to Line voltage RY= ? And Formula....?

1758


i am going to give the JSEB,RANCHI exam for power plant,so i need some samples of papers related to that,so please send me these papers by my mail id.

3520


what do you mean by plant earthing system.

2120


why the name trunking bus PT

3127


Please brief working principle & construction of permanent magnet AC Servo motor

2283


what is control supply rating of a machine

2040


Generator,motor and alternator Working principal Please explain easily

1508