Answer Posted / ankur shrivastav
Your question is wrong.what do you want to ask, which IS code..
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
TELL ME THE EQUATION FOR OGEE SPILLWAY
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
How to check slab shuttering level.? Or check list for slab ?
how to calculate the size of triangular ring in rcc column?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
What glue is least sticky?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
what is civil engineer greatest strength and weakness?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
how to workable concrete cube test M-25 design mix
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.