Answer Posted / ankur shrivastav
According to IRC 21:2000, clause 304.6.2----
Development/Lap Length is depends upon various factor--
like-
1. Grade of Concrete
2. Grade of Steel
3. Bonding Zone
Lap Length will be- nx Dia
Value of n is as below-
M20 M25 M30 M35 M40 and above
Fe500 66 56 48 42 42
Fe415 55 46 40 35 35
Fe 240 65 60 55 50 50
These values belongs only for bonding zone-1*.
For Bonding zone 2- n=1.4 x value of "n" in bonding zone 1
* Bonding Zone 2- Bonding Zone 2 is a zone where bar has been bent less than 45 degree angle and more than 300 mm fresh concrete is casted below the bars.
All other locations are bonding zone 1
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
Define What happens to Load at yielding ?
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
what are the values of compressieve strenght?
How cracks in concrete can be avoided?
Name the main components of a cad gui?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
how water proof chemicals act in concrete to avoid leek?
How do You Maintain a structure after getting cube test of low strength.
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
what is Brick crushing strength(PSI)?
all technical question
What is Refuse Area In High Rise Building ?
What does civil status mean?