Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
How many days should curing of plastering, brick work and concrete
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
what is difference between fluidity and workability also how palsticizer works
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
what is flexible and rigid footing?
What is absolute coordinates?
What is the zero value in quantity surveying
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
How to calculate the crank rod in slab
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
how to calculate weight of 1.8 cum of aggregate
Explain soil analysis?
In earth work 1300 cum soil how to calculate how many liters require in water