I have used the proportion of cement:sand:gravel, is 1:2:4.
cement and the sand was provided by the company but i
provided the gravel. this combination was used to fill 500
cubic ft of wall. now i want to know how much gravel was
used in making the wall. can you guys please help me?
Answer Posted / fasil ebrahim
for finding amount of sand used 0.45x500= 225 cft
for gravel 0.9x500 = 450 cft
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what are the Task work of different labour.?
How and where are aqueducts built?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
Prepare a Schedule for a Highrised building from starting stage to Handover?
How many square meter can a worker/labor demolish a structure per day?
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
who to find building iron rod strenth
How much cement and sand required for 9"brick wall per square metre
Describe the various methods of concrete curing?
why development length = 50D . why not 100D
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
what is diversion?
The concrete slump recommended for beams and slabs; is?