Answer Posted / m.ramakrishna
2400kg/cum is correct
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
Scaffolding IS code NO.
what is education Cess.
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
Volume of 25kg putty bag & 40 kg putty bag volume??
how statics is different from dynamics
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
Cement consumption of one cubic meter of aerocon blocks masonry?
what is anchorage length,lap length and (dont remember the last one)
what is the difference between prime coat and tack coat in road construction
Why Vitrified tile are getting pop up.