Answer Posted / anupam nath
Chemical reaction of cement and water will gives strength
to concrete. As soon as concrete placed in its place and
normal weather condition, during day time water percentage
in concrete evaporate and to retain the water in concrete
for at least seven days, we used to cure the structure by
sprinkling water on it.Curing starts after 24 hrs of
pouring.
| Is This Answer Correct ? | 27 Yes | 2 No |
Post New Answer View All Answers
What is the best type of wood glue?
How to fix toll charge for a particular vehicle at toll booths in a highway?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
what is the composition of good brick ?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
How many Sft of Level Plaster per Kg
Specific gravity of cement?
how calucate cement sand ratio for plstering
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
What is semirigid connections?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
what is civil all interview questions
What is the maximum strength of cub compress strength in one cub testing
What are the important hardware systems used for cad?