Answer Posted / anupam nath
Chemical reaction of cement and water will gives strength
to concrete. As soon as concrete placed in its place and
normal weather condition, during day time water percentage
in concrete evaporate and to retain the water in concrete
for at least seven days, we used to cure the structure by
sprinkling water on it.Curing starts after 24 hrs of
pouring.
| Is This Answer Correct ? | 27 Yes | 2 No |
Post New Answer View All Answers
Howmuch bend to be provide for 200/600 BEEM
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
IS code for Rolling Margin of steel
i want texture painting pwd data
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
Explain moment of inertia?
Define angular dimension?
Explain what is the difference between built area and super built up area?
What is the use of water table & Kreb stone for drain
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
how much to get of BRC lapping in full yield and half yield ?
What is construction mitigation management?
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft