Answer Posted / anupam nath
Chemical reaction of cement and water will gives strength
to concrete. As soon as concrete placed in its place and
normal weather condition, during day time water percentage
in concrete evaporate and to retain the water in concrete
for at least seven days, we used to cure the structure by
sprinkling water on it.Curing starts after 24 hrs of
pouring.
Is This Answer Correct ? | 27 Yes | 2 No |
Post New Answer View All Answers
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
what is Bearing Capacity,How to determine it?
cement and sand required for one block of size 0.23*0.15*0.46
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
How do you prepare Material Recovery Statement for deduction from contractors bills?
Why is concrete cube test carried out?
how to calculate MR 9(derivation)
how pumping of concrete effects the quantity of material used in it?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
What are the alternate material for steel, Sand and aggregate