Answer Posted / nawin chandra jha
1) Load bearing structure.
2)Frame structure.
3) combine structure.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
What is the Maximum %age of Steel in columns and beams ?
What is the cost difference between site mix and ready mix concrete per cubic meter
IS code for Rolling Margin of steel
why we are using stub column..? is it possible to construct steel stub column..?
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
How to come 1.54 from dry to wet concrete?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?