Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is meant by velocity & gravity ?what is the difference
between normal liquid flow & gravity liquid flow ?

Answer Posted / sailesh kumar swain

velocity is the speed of something in a given direction ,where as gravity means the force that attracts a body towards the centre of the earth,or towards any other physical body having mass.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Does brick grows bigger every year?

1150


The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it

6165


What is Rankine Cycle?

1097


Why should pumping be not used in case of concreting works?

1428


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2096


what is Brest Wall?

1338


how to calculate the strength of rebound hammer test reading in building construction ?

3366


at what pressure ply-wood is obtained by gluing wooden sheets

2596


What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?

2574


What are the ingredients of pre-stressed concrete?

1238


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

2455


dialation means

2459


What is change order request?

1108


what is the meaning of 40/20 src

6283


Detection of a beam & a girder are––––

2224