Is there any possibility of changing in dia of bar from
lower to higher (i.e Lower dia bar at bottom and Higher dia
bar at top)
Answer Posted / lakshmana sekar.s
possible
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
What is the coeffiencent Friction Angle between Steel and Ashphalt?
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
Explain what is alternate bid?
can i get hindi version of is codes based on civil engineering?
Dear Sir What is the Contraction joint for base Slab
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
What things you need to take care of before building a kitchen island?
What is the zero value in quantity surveying
For what purpose bedding is used under storm water drains?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr