Answer Posted / anupam nath
though initial setting time of cement is 30 min., so mortar
should also be consumed within this time.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
What do we mean by partial moment release ??
What is critical path method (c.p.m)?
How to arrive dry volume of concrete (1.52 to 1.57) ?
What is the snap size in civil and how can we create it?
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
What are the common ways of demolition?
What is componsation
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
What is Base Shear ?