Answer Posted / devineni
at center min and at end max of span.
Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
what is the weight of 12mm aggregates?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
How to hide dimensions in autocad?
how calucate cement sand ratio for plstering
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
How much cement,sand,bricks and water needed for 1square metre brick work?
why are you joining in this (applied post) job and your aim for this job
Why are steel plates inserted inside bearings in elastomeric bearings?
quantity of material needed for rubble stone masonry for 1:4 and 1:6
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
rimmer in pile foundation
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed