Answer Posted / devineni
at center min and at end max of span.
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
How to calculate plastering for elevated water storage tank
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Explain the design for rcc multi-storied building?
how clculate excavated or backfilling quantity by simpson's rule
What is alternate bid?
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
Will water damage concrete?
how to calculate spacing rod in column